Lake Lisgar Bridge
Owner: The Town of Tillsonburg
Project Location: Tillsonburg, Ontario
Architect: Spriet & Associates
Project Manager: Greg Eyre
Site Supervisor: Greg McKenzie
Contract Amount: 74,000.00
Project Description: The Lake Lisgar pedestrian bridge involved the installation of intermediate piles in Lake Lisgar onshore bridge abutment. The erection of the structure was completed using an onshore 40 ton crane and a 25 ton barge mounted unit c/w a 300 hp lake tug.
Lake Lisgar Gazebo was desinged for both an attractive public use facility and as an added safety feature covering an overflow chamber. This is an all-steel structure featuring a Dura-Loc metal roofing system. |